Registering a solar system: Eskom, your municipality and NERSA

A rooftop solar or battery system that is connected to the grid is a small-scale embedded generator, an SSEG, in the language of the Electricity Regulation Act, and the law requires it to be registered with whoever supplies your electricity. Most systems installed in the load-shedding years never were. Eskom and the big municipalities have spent 2025 and 2026 running amnesty-style campaigns with the fees waived, and the current waiver ends on 30 September 2026. This guide sets out who registers where, what you hand in, and what it costs, from Eskom’s and the regulator’s own statements.

100 kVAup to this, register with Eskom or the municipality; above it, with NERSA as well
3 documentsthe CoC, the NRS 097-2-1 inverter certificate and the installation test report
R0Eskom registration, connection and smart meter for systems up to 50 kVA until 30 September 2026
Up to R36 000the value of the waived charges for a rural Eskom customer; R10 000 urban

Who must register, and with whom

The three documents

Eskom has cut its list to three, and the municipalities ask for the same core set.

  1. The electrical certificate of compliance, signed by a registered person, covering the inverter, its circuit and the earthing. A solar system is an alteration to the installation, so a supplementary certificate is required under the Electrical Installation Regulations even where the house already has one. The certificate of compliance guide explains who may sign it.
  2. The NRS 097-2-1 type test certificate for the inverter, from the equipment supplier. NRS 097-2-1 is the South African grid-connection specification, and inverters are tested against it by model. Cape Town and Eskom both keep approved lists; an inverter that is on a European list but not on the NRS list will be refused.
  3. The embedded generation installation test report, on Eskom’s form. Since Eskom’s 2025 simplification this may be signed by an installation electrician or a master installation electrician registered with the Department of Employment and Labour. A single phase tester may not sign it, and an ECSA-registered engineer is no longer needed for these small systems.

With those in hand Eskom’s process is three steps: submit your details online, upload the documents, and receive approval and a smart meter installation, which it schedules at no cost during the waiver.

What it costs

On 26 March 2026 Eskom extended its fee waiver from 31 March to 30 September 2026. For Eskom customers with systems up to 50 kVA, all registration and connection fees and the smart meter are waived, which Eskom values at up to R10 000 for urban and residential customers and up to R36 000 for rural customers. Non-residential customers get reduced connection charges. A prepaid option is being rolled out so residential customers can keep prepaid metering and still qualify. After the waiver, the normal quotation, connection, meter and tariff-conversion charges return, and Eskom says a typical residential customer saves over R9 000 by registering while it lasts.

Municipalities set their own charges. The City of Cape Town, for example, requires a bi-directional advanced meter for SSEG customers, has capacity limits for residential systems, and pays for exported energy at a feed-in tariff it publishes each year, and it has run its own fee waiver alongside Eskom’s. Check the current application guide on the City’s electricity services page before you install, because the inverter list and the meter rules change.

What the installer must hold

Tax, briefly

The household solar rebate for individuals, 25 percent of the cost of new panels up to R15 000, applied only to panels brought into use between 1 March 2023 and 29 February 2024, and is gone. For businesses, the section 12B allowance still lets the cost of renewable generation assets be written off, and the temporary 125 percent version applied to assets brought into use between 1 March 2023 and 28 February 2025. A business installing solar today claims the standard section 12B deduction; ask your accountant which rate applies to your asset and year.

What actually goes wrong

Frequently asked questions

Do I have to register my solar system if I never export power?

Yes. Eskom’s own rule is that all households and small businesses with systems below 100 kVA connected to its network must register, even if they do not export. Systems above 100 kVA up to 1 MW register with Eskom and with NERSA. If you are on a municipal supply you register with the municipality. Only a system that is fully off-grid, with no connection to the supplier’s network, is exempt, and Eskom asks for a declaration and proof of that.

What documents does Eskom need to register a solar system?

Three: a valid electrical certificate of compliance signed by a registered person; the NRS 097-2-1 type test certificate for the inverter, from the equipment supplier; and a basic embedded generation installation test report, which an installation electrician or master installation electrician registered with the Department of Employment and Labour may now sign. A single phase tester may not sign the test report, and an ECSA-registered engineer is no longer required for these small systems.

What does it cost to register solar with Eskom?

Nothing for systems up to 50 kVA until 30 September 2026. Eskom has waived all registration and connection fees and the smart meter for Eskom customers in that band, which it values at up to R10 000 for urban and residential customers and up to R36 000 for rural customers. The waiver was extended in March 2026 from its earlier 31 March 2026 end date. After it ends, the normal quotation, connection and metering charges apply.

Does the installer need any special registration?

The installation must be certified by a registered person under the Electrical Installation Regulations and the business doing it must be a registered electrical contractor, because a solar system is an alteration to the electrical installation. The SAPVIA PV GreenCard is a voluntary industry quality programme that many banks and clients ask for, but it does not replace the registered person’s certificate of compliance.

We lodge the SSEG registration for you, R890

For a homeowner, a business or an installer handing over a finished system: we check the certificate, the inverter certificate and the test report against the supplier’s current list, complete the Eskom or municipal application, lodge it and chase it to the approval and the meter appointment. Before 30 September 2026, that is the whole cost.

Register my solar

Keep exploring

Sources: Eskom’s small-scale embedded generators page and its media statement of 26 March 2026 extending the fee waiver to 30 September 2026; NERSA’s media statement of 2 February 2026 as quoted by Eskom; Schedule 2 of the Electricity Regulation Act 4 of 2006 as amended; the Electrical Installation Regulations, 2009; NRS 097-2-1; SANS 10142-1; the City of Cape Town’s SSEG requirements; sections 6C and 12B of the Income Tax Act. Municipal rules and lists change; confirm with your supplier before you install. This is information, not legal advice.